Godet Spinning, Stretching, AFT and Dryer Line
• Scope: Conversion of Rockwell
Automation based control system
into DeltaV DCS
• Location: India
• Duration: Back Office: 120 days, Site: 180 days
• Team Size: 4
• IO Count: 1500
• Activities:
– Created IO list from existing control system
– Studied control narrative and made logic flow diagrams
– Met with End User teams and gathered requirements
– Developed DeltaV DCS application
– Conducted software FAT with End User
– Commissioned new DCS system at siteOur expertise in modern automation platforms and industry standards enables us to deliver reliable, scalable, and efficient automation systems that improve plant productivity, operational visibility, and regulatory compliance.
• Location: India
• Duration: Back Office: 120 days, Site: 180 days
• Team Size: 4
• IO Count: 1500
• Activities:
– Created IO list from existing control system
– Studied control narrative and made logic flow diagrams
– Met with End User teams and gathered requirements
– Developed DeltaV DCS application
– Conducted software FAT with End User
– Commissioned new DCS system at siteOur expertise in modern automation platforms and industry standards enables us to deliver reliable, scalable, and efficient automation systems that improve plant productivity, operational visibility, and regulatory compliance.
Boilers and Utilities
• Scope: Conversion of ABB DCS into
DeltaV DCS
• Location: India
• Duration: Back Office: 150 days, Site: 300 days
• Team Size: 3
• IO Count: 3000
• Activities:
– Created IO list and logic diagrams from ABB DCS
– Explained process to End User teams
– Developed logic in DeltaV DCS
– Implemented and supported on client site
• Location: India
• Duration: Back Office: 150 days, Site: 300 days
• Team Size: 3
• IO Count: 3000
• Activities:
– Created IO list and logic diagrams from ABB DCS
– Explained process to End User teams
– Developed logic in DeltaV DCS
– Implemented and supported on client site


Chocolate Manufacturing Line
• Scope: Replacement of Schneider
control system with Rockwell
Automation
• Location: India
• Duration: Back Office: 180 days, Site: 15 days
• Team Size: 3
• IO Count: 2000
• Activities:
– Designed new control cabinets for compatibility
– Studied and documented control logic
– Developed logic in Rockwell PlantPax DCS
– Supervised cabinet replacement and commissioning
• Location: India
• Duration: Back Office: 180 days, Site: 15 days
• Team Size: 3
• IO Count: 2000
• Activities:
– Designed new control cabinets for compatibility
– Studied and documented control logic
– Developed logic in Rockwell PlantPax DCS
– Supervised cabinet replacement and commissioning
Gas Extraction, Processing and Storage (On Going)
• Scope: Migration of DeltaV DCS
into Schneider Foxboro system
• Location: Kuwait
• Duration: Back Office: 120 days
Site: In Progress
• Team Size: 6
• IO Count: 8000
• Activities:
– Creating IO list and logic flow diagrams
– Explaining logic to Schneider team and End User
– Will be assisting in FAT and provided site support
• Location: Kuwait
• Duration: Back Office: 120 days
Site: In Progress
• Team Size: 6
• IO Count: 8000
• Activities:
– Creating IO list and logic flow diagrams
– Explaining logic to Schneider team and End User
– Will be assisting in FAT and provided site support